注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

江南的博客

编织快乐生活

 
 
 

日志

 
 

【转载】蓝段染脖套  

2015-12-04 16:03:27|  分类: ——围脖 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |
本文转载自编织幸福《蓝段染脖套》
蓝段染脖套 - 编织幸福 - 编织幸福的博客
 
蓝段染脖套 - 编织幸福 - 编织幸福的博客
 
蓝段染脖套 - 编织幸福 - 编织幸福的博客
 
蓝段染脖套 - 编织幸福 - 编织幸福的博客
 
蓝段染脖套 - 编织幸福 - 编织幸福的博客
 
蓝段染脖套 - 编织幸福 - 编织幸福的博客
 1-into-3: 

Worked on RS: K into back and front of st, pick up strand between two sts, twist and k into strand. 1 st increased to 3 sts.
Worked on WS: (P tbl, k, p tbl) into same st. 1 st increased to 3 sts.

1-into-5
Step 1: Insert right needle between first 2 sts on left needle, wrap yarn and pull through, slip first st on left needle to right needle. 
Step 2: Insert left needle between first 2 sts on right needle, wrap yarn around left needle as though to make k st, pull yarn through, slip first st on right needle back to left needle. Repeat Steps 1 and 2 once more, slip 3 sts without working. 1 st increased to 5.

5-into-1
Worked on WS: Slip next 3 sts to right needle, pass 2nd slipped st over first slipped st and off needle. Pass st from right needle back to left needle and slip 2nd st on left needle over first st and off needle. Slip st from left needle to right needle and pass 2nd st over first st and off needle. Pass rem st on right needle back to left needle and slip 2nd st on left needle over first st and off needle; k rem st.

C2R (cable 2 right): Slip next st to cn and hold at back of work, k1; k1 from cn.

C2L (cable 2 left): Slip next st to cn and hold at front of work, k1; k1 from cn.

T3R (twist 3 right): Slip next st to cn and hold at back of work, k2; p1 from cn.

T3L (twist 3 left): Slip next 2 sts to cn and hold at front of work, p1; k2 from cn.

T4R (twist 4 right): Slip next 2 sts to cn and hold at back of work, k2; p2 from cn.

T4L (twist 4 left): Slip next 2 sts to cn and hold at front of work, p2, k2 from cn.

C4R (cable 4 right): Slip next 2 sts to cn and hold at back of work, k2; k2 from cn.

C5L: Place next 3 sts on cn and hold at front of work, k2; sl p st from cn back to left needle and p1, k2 from cn.

DIRECTIONS

Using provisional CO and waste yarn, CO 57 sts.

Row 1 [RS]: Work Row 1 of Right Edging across first 8 sts, Row 1 of Cable Pattern and Row 1 of Left Edging across final 8 sts. 61 sts.

Row 2 [WS]: Work Row 2 of Left Edging across first 8 sts, Row 2 of Cable Pattern and Row 2 of Right Edging across final 8 sts. 65 sts.

Continue to work as set, until you have completed 2 full repeats of the 76-row Cable Pattern, and rows 1-74 of a third repeat.

FINISHING
Place live sts from Row 74 onto waste yarn. 

Soak cowl, remove excess moisture and lay flat to dry. 

Once completely dry, carefully unpick provisional CO and place 57 sts back onto needle. Place live sts from Row 74 back onto needle and join ends of cowl, either by grafting or with a three-needle BO.

 

  评论这张
 
阅读(50)| 评论(0)
推荐 转载

历史上的今天

在LOFTER的更多文章

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017